Home » Projects
Current Projects


We have a diverse resume of projects, from simple structures to state of the art facilities, in both the private and public sectors.  Below are some of our larger projects.


Private Residence Repairs - Santa Rosa

This project involves the complete removal and replacement of interior and exterior finishes, roofing replacement, exterior decks repairs, MEP repairs, and sitework repairs.

Current Contract Value = $3,500,000

Scheduled Completion =  April 2019


Private Residence Sitework - Alamo

This project involves the construction of new retaining walls, paver patios, a gas fire pit, stone faced stairs, an existing roof overhang extension, and a loggia to cover an existing outdoor kitchen area.

Current Contract Value = $466,730

Scheduled Completion = April 2019


Addison & 9th Walkway Repairs

This project involves the removal and replacement of exterior elevated walkways on mirror image condominium buildings.  Unit egress must be maintained at all times.

Current Contract Value = $325,156

Scheduled Completion = May 2019


Sparks Nevada Roof Retrofits

This project involves the seismic retrofitting of warehouse roof structures in four separate buildings.  All work must be done in a manner that minimizes impacts to the existing tenants.  All work is being done from below the roof structure off of lifts.

Current Contract Value = $1,363,866

Scheduled Completion = June 2019


Northstar Village Misc. Building Repairs

This project involves the replacement of siding and windows on two residential buildings, as well as a partial podium slab waterproofing repair.  The podium waterproofing repair involves removing the existing paver system and dirt fill down to the concrete podium top, preparing the podium top for a new waterproofing membrane, installation of a new waterproofing membrane, compaction of new dirt fill, and a new paver system.  The project is phased, and is being completed over the 2018 and 2019 summer seasons.

Current Contract Value = $5,589,278

Scheduled Completion = November 2019